浅析地下停车场无震动止滑坡道地坪施工办法

作者:地坪 来源:未知 日期:2017-9-25 9:16:16 人气: 标签:
导读:地下停车场出入口坡度都比较大,因此对地面的防滑性要求很高。地下车库止滑坡道地坪施工难度比较大,主要包含7个步骤,具体施工方法如下:The underground parki

地下停车场出入口坡度都比较大,因此对地面的防滑性要求很高。地下车库止滑坡道地坪施工难度比较大,主要包含7个步骤,具体施工方法如下:

 The underground parking lot has a large entrance slope, so it has high anti-skid requirements on the ground. The construction of underground garage is more difficult to construct, including 7 steps, the specific construction method is as follows:

1、清理、清洁基面

1. Clean and clean base surfaces

用高压水枪清洗地面,清除地面油污和其它杂质,如果有坑洼、孔洞等也要处理好。

Clean the ground with a high pressure water gun to remove oil and other impurities from the ground. If there are potholes, holes, etc.

2、底涂施工

2. Foundation construction

整体喷洒渗透底涂材料,渗入混凝土并封闭毛孔,使混凝土地面牢固整合。

The whole spray permeates the bottom material, seeps into the concrete and closes the pores, so that the concrete surface is firmly integrated.

3、抗压层施工

3. Construction of compressive layer

待底涂干燥后,批刮止滑抗压层,在绝大多数的坡道止滑地坪工程中,抗压层用的都是黄色止滑抗压材料,这一层将会部分裸露,作为坡道线部分。

After being painted is dry, batch stop slippery compressive layer, in the vast majority of ramp stop slippery ground level ground engineering, compressive layer with a stop slippery compressive materials are yellow, this layer will be part of the bare, as a ramp line part.

4、划线并贴美纹纸

4. Underline and paste American paper

在地面上划好辅助网格线,规划好坡道线的位置及形状,最后在规划好的坡道线位置贴好美纹纸。

Draw the auxiliary grid line on the ground, plan the position and shape of the ramp line, and finally put the beautiful grain paper in the position of the planned ramp line.

5、面层防滑层施工

5. Construction of surface layer non-slip layer

先用80目骨料配比砂浆,批刮防滑面层(有些用的是绿色有的是黑色),贴美纹纸部分可以不刮。然后再用40目骨料砂浆(较粗)喷涂巩固。

Use 80 mesh aggregate to match mortar, batch of anti-slip layer (some of which are green or black), and the paper will not be scratched. Then it is reinforced with 40 mesh slurry (thicker).

6、去除美纹纸

6. Remove American paper

面层完成30分钟后,在面层砂浆没固化之前,去除美纹纸。但这里的美纹纸清除方法与普通环氧地坪划线的美纹纸清除不同,不能简单的撕掉,而要一点一点将美纹纸卷起,连同覆盖在美纹纸上方的面层砂浆一同清掉(如下图所示),露出下面的黄色抗压止滑层,美观大方的坡道线就出来啦。

After 30 minutes on the surface, remove the American grain paper before the mortar is solidified. But the cleanup methods and common crepe paper here epoxy floor paint line clear crepe paper is different, can't simply tear, while one point one point rolled up, crepe paper, together with the cover on top of the crepe paper surface mortar with clear off (as shown in the figure below), showing the following yellow compressive stop slippery floors, beautiful and easy slope line will be out.

7、保养及启用

8、7. Maintenance and commissioning

车道自然养护2—3天,方可上人行走,7天后方可车辆行使。

The driveway is naturally maintained for 2 to 3 days before the person can walk for 7 days.